Client: The University of Hong Kong
Architect: Percy Thomas Partnership (HK) Ltd
Engineer: Wong & Cheng Consulting Engineers Limited
Contract Value: HK$136 million
Completion Date: Q2 2021
Location: Cape D’Aguilar, Hong Kong
This site is located within a remote area of Cape D’Aguliar and the logistics is a major consideration.
Works on the existing block involve the installation of an aquarium, the provision of a main laboratory and technician area for marine related research and testing, a molecular laboratory, meeting rooms, and works to the existing drain channels and waterproofing works were carried out on the roof.
Works were carried out in a well-planned sequence to cause minimal disturbance and interruption to minimise disturbance to users.