Client: Promotal Limited / Hutchison Whampoa Properties Limited
Completion Date: Q1 2019
Location: 18 & 22 Tak Fung Street, Hung Hom, Hong Kong
This project involved Electrical & MVAC and Smoke extraction installations for the five-storey office tower extension and 10-storey hotel tower extension for 330 guestrooms at Harbourfront One & Two Extension.
Electrical
- Coordination of CLP for existing transfomers upgrade
- Modification and upgrading the existing LV Switchboards
- New LV switchboard for the extension floors and connect and integration with the modified switchboards
- Main and sub-main electrical distribution with busbar chamber, MCCB Panel c/w prefabricated branch cable and busduct system
- Extension of the existing low voltage system and extra low voltage system to the extension
- New diesel Generator for essential and non-essential loads of the extension floors
- Floor trunking system to the new office area spare
- Watchman tour, security and access control, CCTV, public address, walkie talkie, broadband, PABX and digital signage systems for the hotel extension
- Room control units for integrated control of lighting, air conditioning and curtain movements, in new guestrooms
MVAC
- Chilled water supply system consists of 2 sets of water cooled chiller units with related water cooling towers, water circulating pumps and related pipework, valves and associated control system
- Air handling units and primary air handling units with variable air volume (VAV) boxes for the new office floors
- Primary air handling units with fan coil units in the new hotel guest rooms and other hotel areas
- Building Monitoring System
- Dynamic smoke extraction system including smoke extraction fans, make-up air fans, fire and smoke dampers, smoke extraction/make-up air duct, insulation and control system