Macau Projects

Theatre Internal Reinforced Concrete Structure and Theatre Internal Structure Steel for the Venetian Macao in Cotai Macau

Client: Venetian Cotai Limited
Lead Consultant: Aedas (Macau) Ltd. and HKS Architecture Ltd.
Regulatory Consultant: Macau Professional Services Ltd.
Structural Consultant: Ove Arup and Partners Hong Kong Ltd.
Construction Manager: Hsin Chong Engineering (Macau) Ltd.
Construction period: January 2007 to November 2007
Contract sum: MOP$59,700,000
Location: Estrada da Baía de N. Senhora da Esperança, Cotai, Macau

This is a multi-function theater suitable for circus show and is the first of this kind in Macau. The project works consist of new construction of internal RC structure including all formwork & falsework from the basement slab to roof. Design, fabrication, delivery and installation of the internal steelwork for the theatre.
The total contract sum of the project is MOP$59,700,000 and the project has been completed in November 2007.

Theatre Internal Reinforced Concrete Structure and Theatre Internal Structure Steel for the Venetian Macao in Cotai Macau - Theatre

Theatre Internal Reinforced Concrete Structure and Theatre Internal Structure Steel for the Venetian Macao in Cotai Macau - Theatre

Theatre Internal Reinforced Concrete Structure and Theatre Internal Structure Steel for the Venetian Macao in Cotai Macau - Theatre

Sands Podium Structure, Sands Casino, Macau

Client: Venetian Macau Limited
Executive Architect: Aedas (Macau) Ltd.
Design Architect: Paul Steelman Design Group
Engineers: Ove Arup & Partners Hong Kong Ltd.
Construction Manager: Hsin Chong Engineering (Macau) Ltd.
Construction period: December 2005 to May 2006
Contract sum: MOP$77,042,500
Location: Sands Casino, Largo de Monto Carlo, No.203, Macau

The development consists of a new podium building of approximately 18,000 square metres in total comprising a lobby level, a mezzanine level, 3 floors of gaming area, a conference and meeting room floor and associated areas of plants rooms and services linked into existing Sand Casino to be operated as one together with the alteration and modification of approximately 5,800 square metres of the existing Sans Casino Building.
The project works consist of new construction of pile cap and concrete frame, demolition and structural alteration. The contract sum is MOP$77,042,500 and this project was completed in May 2006.

Sands Podium Structure, Sands Casino, Macau - Exterior View

Sands Podium Structure, Sands Casino, Macau - Construction Site

Sands Podium Structure, Sands Casino, Macau - Exterior View